Majestic Setting amid Palm-Dotted Gardens and Fountains in Fujairah City...
Great Western Dockyard reconstruction project: MEVA formwork engineering for fast, safe, cost-saving concrete works...
Supporting high-singled wall formwork when pouring the walls of a sluice...
A Masterpiece of Design & Architecture. And a Major Challenge to Formwork Suppliers....
New headquarters for technology leader Meyer Burger in Thun, Switzerland, built with MEVA formwork...
High-rise building: The MGS system protects workers floor by floor to the top...
55.000 de locuri, din care 40 de loje a câte 12 locuri; 20 de trepte de acces. Un complex cu garaj subteran (200 locuri parcare), săli de conferinţă şi restaurante...
Built by 1914, the Klingenberg impounding reservoir in the Ore Mountains near the German-Czech border had been providing drinking water for almost 90 years when it was severely damaged by the big flooding...
Merseburg is a small town near Halle in eastern Germany, where a new bus terminal is being built. Its most conspicuous feature is a flat roof, standing on steel columns 5.88 m high, that will protect a...
Comfortable state-of-the-art homes are in increasing demand by Iran’s aspiring and growing middle class – and are being built throughout the country. Currently, an ambitious large-scale housing project...